Collectively, the last 3 days were pretty rough... lol It was our electrical, plumbing, HVAC, and Guardian rough-ins.
First, it appears that the waterproofing had a run-in with some large equipment which I pointed out to the PM. They look like they attempted a fix but I still see holes, is this a problem?
|
I think as it's stormed the dirt weight has pulled it down and torn it |
|
There's still holes around the white holders, is this a problem? |
I've nicknamed the following the monster:
Most important room in the house:
|
Not the way I would setup the recess lighting. Going to see if they can be moved |
|
1 of the 2 Washer/Dryer hookups :) |
|
What's up with the black trash bags? LOL |
|
There also seems to be some serious erosion issues with our lot |
This rain is driving me crazy. I would address the issues with your pm. Otherwise it looks like they are moving along nicely.
ReplyDeleteI have, hopefully he continues to keep on top of the little issues popping up!
Delete